Jeep Grand Cherokee

1993-1999 of release

Repair and operation of the car



Jeep Grand Cherokee
+ Cars of the Jeep Grand Cherokee brand
+ Settings and routine maintenance
+ Line six-cylinder engine
- V8 engine
   General information
   Repair procedures which implementation does not demand extraction of the engine from the car
   Reduction in the provision of VMT of the piston of the first cylinder
   Removal and installation of covers of heads of cylinders
   Removal, check of a state and installation of yokes and bars of pushers
   Replacement of valvate springs, their plates and maslootrazhatelny caps
   Removal and installation of the inlet pipeline
   Removal and installation of final collectors
   Removal and installation of heads of cylinders
   Replacement of a forward epiploon of a bent shaft
   Removal, check of a state and installation of a cover of a distributive chain, chain and its asterisks
   Removal, check of a state and installation of the camshaft and hydraulic pushers
   Removal and installation of the pallet of a case
   Removal, check of a state and installation of the oil pump
   Removal and installation of a flywheel / driving disk
   Replacement of a back radical epiploon
   Check of a state and replacement of rubber pillows of support of the engine
+ Procedures of the general and capital repairs of the engine
+ Cooling systems, heating and air conditioning
+ A power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and methods of operation



General information

This Head is devoted to the procedures of repair and service of V8 engines which are not demanding extraction of that of the car. All information concerning removal and installation of the engine, and also capital repairs of the block and heads of cylinders can be found in Chapter of the Procedure of the general and capital repairs of the engine.

The description of the procedures provided in the text of this Part of the Head is made on the basis of the assumption that the engine is not removed from the car. In case the engine is taken and installed on the dismantling stand for carrying out complete capital repairs, many of intermediate steps of descriptions will be inapplicable.

The specifications provided in the beginning of this Part of the Head are related only to the procedures described here. The technical requirements concerning performing procedures of repair and restoration of the block and heads of cylinders are provided in Chapter of the Procedure of the general and capital repairs of the engine.

Engines to which this Head is devoted represent V8 engines, with the top arrangement of the valvate mechanism (OHV), of 5211 cm3 (5.2 l), equipped with hydraulic pushers of roller type and electronic system of injection of fuel.