Jeep Grand Cherokee

1993-1999 of release

Repair and operation of the car



Jeep Grand Cherokee
+ Cars of the Jeep Grand Cherokee brand
+ Settings and routine maintenance
+ Line six-cylinder engine
+ V8 engine
+ Procedures of the general and capital repairs of the engine
+ Cooling systems, heating and air conditioning
+ A power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
- Coupling and transmission line
   General information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of switching off of coupling
   Removal, check of a state and installation of components of coupling
   Removal, check of a state and installation of the release bearing of coupling
   Check of a state and replacement of the directing bearing
   Driveshafts, differentials and bridges - the general information
   Check of a condition of the transmission line
   Removal and installation of driveshafts
   Replacement of cardan hinges
   Replacement of an epiploon of a shaft of the leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, capital repairs and installation of a forward power shaft
   Removal and installation of assembly of the forward bridge
   Removal and installation of a back half shaft and assembly of the bearing
   Removal and installation of assembly of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and methods of operation



Removal and installation of assembly of the back bridge

 PERFORMANCE ORDER

  1. Weaken nuts of fastening of back wheels, the car and establish to a poddomkratta it on props. Remove wheels.
  2. Prop up assembly of the back bridge the cart jack got under differential.
  3. Give the lower nuts of fastening of shock-absorbers, squeeze shock-absorbers, having moved away them from a way (The head Podvesk and steering).
  4. Disconnect the driveshaft from the holder of a crosspiece of a shaft of the leading gear wheel of differential and suspend its back part to the car bottom by means of a piece of a wire (Section Check of a Condition of the Transmission Line).
  5. Otboltite a bar of the stabilizer of cross stability from a connecting link of the stabilizer (if are provided).
  6. Disconnect cables of the parking brake from the equalizer (The head the Brake system). Disconnect a rod of management of the pro-portioning height sensor valve from a bridge case (only for the Comanche models).
  7. Disconnect a flexible brake hose from a tee on a case of the back bridge. Zakuporte the end of a hose or wind it with a plastic bag for the purpose of prevention of losses of liquid and hit in system of dirt.
  8. Fix screw springs by safety chains in order to avoid a sletaniye of springs after lowering of the bridge.
  9. Lower a jack and take assembly of the bridge from under the car.
  10. You make installation upside-down. Take care of that nuts of U-shaped bolts and bolts of collars of the cardan hinge were tightened with the required effort.