Jeep Grand Cherokee

1993-1999 of release

Repair and operation of the car



Jeep Grand Cherokee
+ Cars of the Jeep Grand Cherokee brand
+ Settings and routine maintenance
+ Line six-cylinder engine
+ V8 engine
+ Procedures of the general and capital repairs of the engine
+ Cooling systems, heating and air conditioning
+ A power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
- Transfer case
   General information
   Adjustment of draft of switching
   Removal and installation of the transfer case
   Capital repairs of the transfer case - the general information
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and methods of operation



Removal and installation of the transfer case

Removal

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. The car also establish to Poddomkratta it on props.
  3. Remove a strange plate.
  4. Merge oil from the transfer case and transmission (The head Nastroyki and routine maintenance).
  5. Disunite the electric VSS socket. Remove assembly of VSS/nozzle of a speedometer for the purpose of prevention of its damage to process of removal of a box (The head Automatic transmission).
  6. Disconnect the lever of switching of the transfer case from a switching lever rod (see illustrations Components of draft of switching of the NP231 transfer case interfaced to RKPP, Components of draft of switching of the NP231 transfer case interfaced about AT or Components of draft of switching of the NP242 transfer case of models of 1993 of the issue).
  7. Disconnect all vacuum/ventilating lines and plaits of wires from the transfer case.
  8. Remove components of system of release for the purpose of ensuring access to a box and necessary working space (The head of the Power supply system and production of the fulfilled gases).
  9. Remove driveshafts (The head Stsepleniye and the transmission line).
  10. Prop up transmission a cart jack (it is desirable specially equipped for this purpose - safety chains will allow to fix reliably a box on a jack).
  11. Give nuts of fastening of the transfer case to transmission.
  12. Once again make sure that all lines and wires are disconnected from a box, then shift a box together with a jack on the car back so far it will not separate from transmission. During the procedure try to hold a box in horizontal position.
  13. After the main shaft is released, lower the transfer case and take it from under the car.

Installation

 PERFORMANCE ORDER

  1. Having fixed the transfer case on a jack, as well as at removal, by safety chains, lift it in adjusting situation behind transmission and carefully begin to move forward, entering a main shaft into gearing with a secondary shaft of transmission. Do not try to join a box with transmission by force. If the main shaft does not enter transmission, try to povaryirovat an inclination of a box and/or to slightly rotate a shaft for combination of its shlits with reciprocal in transmission.
  2. Establish bolts of fastening of the transfer case to transmission. Tighten them with the required effort.
  3. Having disconnected safety chains, remove the jack which is propping up the transfer case.
  4. Install driveshafts (The head Stsepleniye and the transmission line).
  5. Install into place components of system of production of the fulfilled gases (The head of the Power supply system and production of the fulfilled gases).
  6. Connect vacuum/ventilating lines.
  7. Connect the lever of switching of the transfer case to a rod of the lever and make adjustment of draft (Section Adjustment of Draft of Switching).
  8. Establish VSS/nozzle of a speedometer and connect the electric socket (The head Automatic transmission).
  9. Check oil level in a box, in case of need make having added (The head Nastroyki and routine maintenance). If the car is equipped with RKPP, at this stage it is necessary to check also the level of gearbox oil in it (The head Nastroyki and routine maintenance).
  10. Remove jacks and lower the car on the earth.
  11. Connect a negative wire to the battery.
  12. Carry out trial runs, having made sure of serviceability of functioning of all knots. Check knots for leaks.