Jeep Grand Cherokee

1993-1999 of release

Repair and operation of the car



Jeep Grand Cherokee
+ Cars of the Jeep Grand Cherokee brand
+ Settings and routine maintenance
+ Line six-cylinder engine
+ V8 engine
+ Procedures of the general and capital repairs of the engine
+ Cooling systems, heating and air conditioning
+ A power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
- Automatic transmission
   General information
   Diagnostics of malfunctions - the general information
   Removal and installation of the lever of switching
   Check of a state and adjustment of a cable of switching
   The description, replacement and adjustment of a cable of the drive of a butterfly valve in the mode kik-Down (TV cable)
   Serviceability check, adjustment and replacement of the sensor switch of permission of start
   Adjustment of a cable of the parking lock
   Check of a state and replacement of a support of transmission
   Replacement of an epiploon
   Description of a design, removal and installation of lines and hoses of cooling of transmission
   Removal and installation of an additional cooler
   Removal and installation of automatic transmission
   Replacement of the module of management of transmission (TSM) (only for AW-4 and 42RE)
   Diagnostics of system of electronic control by automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and methods of operation



Removal and installation of an additional cooler

Details of installation of an additional cooler (transmission 42RH and late 46RH)


 PERFORMANCE ORDER

  1. Remove a front grille (Head Kuzov).
  2. Remove the air conditioner condenser if it impedes the implementation of the forthcoming work (The head of the Cooling system, heating and air conditioning).
  3. Mark cooling lines for the purpose of providing a guarantee of the correct connection at assembly.
  4. Establish drain capacity under collars of hoses of a cooler.
  5. Weaken clips collars and remove hoses.
  6. Give all fixture of a cooler to a radiator and its support.

Details of installation of an additional cooler (AW-4 transmission).

Details of installation of an additional cooler (transmission 42RE and early 46RH).
  1. Remove an additional cooler.
  2. Check cooler hoses for existence of cracks and cuts. Cut off the worn-out ends of hoses. In case of detection of defects of the central part of a hose (not on the ends) replace it.
  3. You make installation upside-down. Track reliability of tightening of all fixture and hose clips.